Welcome (log in) | Your Account
English

SHENZHEN YOSO CONNECTOR ELECTRONICS CO., LIMITED

Product Center
Contact Us

 

 

Tel:86 (755) 6125 6514

Fax:86 (755) 2607 2541

Mobile :+86 188 9836 8729

E-mail:[email protected]

Web:www.yosoint.com

skype:+8618898368729( Daisy)

            +8615818641548(Steve)

Add:11B two line Liaokeng Road Shiyan Town Baoan District Shenzhen City 518108 Guangdong provice China 

 

 

2.54mm female header H8.5 wiht long lead single row straight solder

2.54mm female header H8.5 wiht long lead single row straight solder
Product Name : 2.54mm female header H8.5 wiht long lead single row straight solder
Product ID : YS228501SYX
Pitch : 0.8mm~5.08mm
Contact Pins : 02~80pins
Terminal material : Phosphor bronze or brass
Pating : gold plated or tin plated
Terminal type : DIP SMT RA ;Horizontal SMT
Directions

Product Information 

Pitch  2.54mm
Insulator height  3.2mm; 3.5mm; 5.0mm; 5.7mm; 5.9mm; 6.8mm; 7.1mm; 8.3mm; 8.5mm; 11mm
Number of row  Single row; Double row; Triplex row; Four row
Insulator material PBT/ LCP/ PA46/ PA6T /PA9T 
Teminal material  Phosphor bronze or brass 
Type of terminal DIP/ RA /SMT /Horizontal SMT
plating  Gold plated; Tin plated 
Climatic category
55/125/21
Operating humidity Anuual 75%
Location peg Wiht or Whiout 

Package mothod 

Tube package; Pallet package ;Tape&reel package 

Product specification

Rated current: 3.0AMP

Contact resistance: 20mΩ Max

Withstand voltage: 1000V AC/DC

Insulation resistance: 1000mΩ Min

Opertion Temperature: -40C to +105C

Contact Material: Brass

Contact Plating: Au or Sn Over Ni.

Insulator Material: Polyester(UL94V-0)

Standard: PA6T

Max.Processing Temp: 230C for 30-60 seconds

(260C for 10 seconds)

Product Drawing

Inquiry
If you need any information before purchase, you can click our online service,or sent email to us
Title:
 
Your name:
 *
Email:
 *
Telephone:
 
Message:
 *
Code:
   *
     Items marked with * have to be filled in